Streetcar On-Time Performance

Definition: Measures how closely service runs to schedule. Departures are considered on-time, if made within 9 minutes of scheduled departure times.

Performance (September 2025):

Streetcar on-time performance was 96.50% in September 2025, which met the target of 85% or higher.

Note: Due to utility repair work along the streetcar alignment, streetcar service was temporarily suspended starting in September. In the meantime, shuttle vans are servicing all streetcar stops. Streetcar KPIs during the service suspension are based on the shuttle operating statistics.